Get started
Feature Prioritization Board

Feature Prioritization Board

Decide whether to build a backlog item: tests it for one-loud-customer demand, hidden effort scope and roadmap misfit with a verdict from three review lenses applied in turn by one model.
#Research
Rating
More ratings needed
Sold
0
How to use
Download

Decide whether to build a backlog item: tests it for one-loud-customer demand, hidden effort scope and roadmap misfit with a verdict from three review lenses applied in turn by one model.

How it works

Reviews a pasted feature request, backlog item or PRD through three reviewer lenses: User Value Skeptic (is this wanted by many users or one loud requester), Effort Realist (hidden scope behind words like 'just', missing edge cases, unshipped dependencies) and Strategic Fit Pragmatist (does it move this quarter's stated goal, and what is the opportunity cost). Phase 2 has the lenses challenge and corroborate each other's findings, and Phase 3 tags each finding CONFIRMED, CORROBORATED or DISPUTED and ends with a build, defer or cut recommendation. The lenses are roles applied by one model, so the cross-checks are self-checks; spot-check the findings. It asks for missing user counts, revenue impact, competitive and effort inputs instead of assuming them. It does not write the PRD or replace usage data. Text you paste is sent as-is to the model, so redact customer names and revenue figures first.

Sample output

Sample input (an invented example):

Use the Feature Prioritization Board on this (a sample I wrote).

Backlog item BL-212: "Custom PDF report builder" for our fictional invoicing app, Ledgerwick.

Why: Our biggest enterprise customer (large enterprise account "Tidewrack Freight") asked for it on a call, and our VP of Sales says it would unblock their renewal. Request: let users drag fields into a branded PDF report template and schedule it by email.

Effort: Engineering says "just a quick add on top of the existing CSV export", estimated 2 weeks for one engineer. Depends on the new permissions model, which is still in review.

Roadmap context: This quarter's stated goal is to raise self-serve trial-to-paid conversion from 6% to 9%. Other backlog items competing for the same sprint: onboarding checklist (BL-198) and a bank-feed import fix (BL-205).

No usage data attached. One other customer mentioned reports in a survey last year.

Real, unedited output:

## Phase 1 — Lens findings
Mode: one lens at a time

### 👥 User Value Skeptic
- **UV1. Demand rests on one loud account.** The case is that Tidewrack Freight "asked for it on a call" plus a VP of Sales saying it "would unblock their renewal." The only other signal is that "one other customer mentioned reports in a survey last year," and "no usage data" is attached. That is two data points, one of them a stale mention, presented as justification for a full report builder. *Consequence:* the team builds something only Tidewrack opens. *Fix:* pull the export usage logs and count report-related support tickets and requests before committing.
- **UV2. Possible overlap with the existing CSV export.** The CSV export already gets the data out. Nobody has shown which part of the request (drag-and-drop, branding, scheduling) is the part Tidewrack actually needs. *Consequence:* the team ships a full builder when a narrower extension might satisfy them. *Fix:* ask Tidewrack which single capability blocks the renewal.
- **UV3. Wrong audience for most users.** Branded templates and scheduled email reports are an enterprise-admin workflow. A self-serve trial user evaluating an invoicing app is unlikely to touch it (assumption: the input has no trial-user behaviour data).

### ⚙️ Effort Realist
- **ER1. "Just a quick add" hides most of the scope.** The request covers four separate systems: a drag-and-drop template editor, branded PDF rendering (logos, layout, pagination), a scheduler, and email delivery. The CSV export at most supplies the data query. "2 weeks for one engineer" covers maybe the first slice. *Consequence:* the sprint blows up mid-quarter. *Fix:* re-estimate each of the four components separately.
- **ER2. Blocked by unshipped work.** The feature "depends on the new permissions model, which is still in review." Scheduled reports emailed outside the app need field-level access rules, so this dependency is real and isn't reflected in the 2-week figure. *Consequence:* the engineer either sits idle or builds against a permissions API that may change. *Fix:* get a landing date for the permissions model and start no earlier.
- **ER3. Run cost is unbudgeted.** Ongoing costs aren't mentioned: failed scheduled jobs, email deliverability, PDF edge cases (long tables, multi-page invoices, currency and locale formatting), and support for customer-built templates. *Consequence:* a permanent maintenance tax on future quarters. *Fix:* include ownership and on-call for the scheduler in the estimate.

### 🎯 Strategic Fit Pragmatist
- **SF1. Doesn't move this quarter's goal.** The stated goal is "raise self-serve trial-to-paid conversion from 6% to 9%." The request comes from an existing enterprise customer at renewal, which is a different segment and a different metric (retention). *Consequence:* a sprint spent with zero movement on the quarter's metric.
- **SF2. Opportunity cost against conversion-adjacent work.** The item competes for the same sprint with the onboarding checklist (BL-198) and the bank-feed import fix (BL-205). An onboarding checklist plausibly targets trial conversion directly (assumption: no impact estimate was provided for either item).
- **SF3. The renewal argument is a different goal and unverified.** "Would unblock their renewal" is secondhand from Sales. No renewal date or account value is given. If retention of this account matters more than the quarter goal, that should be an explicit exec trade-off, not slipped in as a normal backlog item.

## Phase 2 — Cross-examination
- **[UV1]** corroborated by Strategic Fit: "One enterprise requester is exactly the off-segment signal SF1/SF3 flag." No concrete challenge from Effort.
- **[UV2]** **challenged** by Effort Realist: "It isn't a duplicate. The request explicitly asks for branded PDFs, drag-and-drop and scheduled email, none of which a CSV export provides; that gap is ER1's whole point." Strategic Fit partly corroborates the narrower-alternative angle: "A minimal fix for Tidewrack costs less sprint."
- **[UV3]** corroborated by Strategic Fit: "Same issue as SF1." This finding is merged into SF1.
- **[ER1]** corroborated by User Value: "A big real scope is a big bet on two data points." Also corroborated by Strategic Fit: "An overrun eats the BL-198/BL-205 slot." No challenge.
- **[ER2]** corroborated by Strategic Fit: "A blocked start means the sprint slips regardless of priority." User Value challenge: none. A possible argument that the permissions model will land soon was raised, but no date is given, so the challenge is unsubstantiated.
- **[ER3]** no lens challenged or corroborated it with a specific reason.
- **[SF1]** corroborated by User Value (UV3). A challenge was attempted by User Value: "Losing the account is a real cost." It was not accepted, because that concerns retention, not the conversion metric. The point is carried into SF3.
- **[SF2]** **challenged** by User Value: "The input gives no usage or impact data for BL-198 or BL-205 either, so claiming they beat BL-212 is equally unevidenced." Corroborated by Effort Realist: "If BL-212's true size is several sprints, it displaces both."
- **[SF3]** corroborated by User Value: "The renewal claim is the only value evidence, and it's secondhand." This finding is merged into UV1.

## Phase 3 — Board verdict
1. **[CORROBORATED]** Demand evidence is one enterprise account plus one year-old survey mention, and the "unblocks renewal" claim is secondhand and unquantified (UV1 + SF3). *Fix:* get the renewal date and account value, and confirm directly with Tidewrack what actually blocks the renewal. Treat any build as an explicit retention exception.
2. **[CORROBORATED]** It doesn't move the quarter's goal (6% → 9% self-serve trial-to-paid) and serves enterprise admins rather than trial users (SF1 + UV3). *Fix:* don't count it toward the quarter's goal. If it's built, label it retention work.
3. **[CORROBORATED]** The "quick add on top of CSV export, 2 weeks" estimate covers a fraction of the scope: editor, PDF rendering, scheduler, and email delivery (ER1). *Fix:* re-estimate each component separately.
4. **[CORROBORATED]** It depends on the permissions model, which is still in review, and that dependency isn't in the estimate (ER2). *Fix:* get a landing date and schedule after it.
5. **[CONFIRMED]** Ongoing run and maintenance cost (scheduled-job failures, deliverability, PDF edge cases, template support) is unbudgeted (ER3). *Fix:* assign an owner and include it in the estimate.
6. **[DISPUTED]** The feature may overlap the existing CSV export, and a narrower extension might satisfy the need (UV2). *Challenge:* "The requested branding, drag-and-drop and scheduling go well beyond CSV, so it's not a duplicate." *Corroboration noted:* Strategic Fit supports scoping a minimal version. (Your call: the duplicate claim is weak, but the "find the one capability that matters" point stands.)
7. **[DISPUTED]** Opportunity cost: BL-198 and BL-205 are better fits for this sprint (SF2). *Challenge:* "No impact data is given for those items either." *Corroboration noted:* Effort Realist says the real size of BL-212 would displace both. (Your call: worth attaching even rough conversion-impact estimates to BL-198 and BL-205.)

**Prioritization recommendation:** Defer. There are 4 CORROBORATED findings: thin demand, off the quarter goal, an unrealistic estimate, and an unshipped dependency. If the Tidewrack renewal risk is real and material, handle it as an explicitly approved retention exception, scoped to the single capability they need. Don't build the full builder until the permissions model lands.

**Missing inputs for a sharper pass:** the Tidewrack renewal date and account value, the landing date for the permissions model, what the CSV export does today, and any expected conversion impact for BL-198 and BL-205.

Report consistency rules

  • The first line under the Phase 1 heading must be Mode: one lens at a time (or Mode: sub-agents if sub-agents were actually used). Never omit it.
  • Tags follow Phase 2 exactly: a finding another lens corroborated is CORROBORATED (never CONFIRMED); a finding with a concrete challenge is DISPUTED; CONFIRMED means no lens challenged or corroborated it. One issue gets one tag: merge duplicates.
  • Every Phase 1 finding must either appear in Phase 3 or be merged into a listed item; list tagged items in the order CORROBORATED, CONFIRMED, DISPUTED.
  • Every count in the closing line must equal the number of tagged items above it; recount before writing it.
  • Use only facts, figures and dates that are in the pasted input. Anything else (market rates, outside examples, assumptions about the sender, reader or timing) must be labelled "assumption" or "unverified", never stated as fact. When comparing dates or durations, state the reference date used and write out the arithmetic.
  • Cite clause, line or item numbers only from the input text, and check the number against the text before citing it.

Handling sensitive info in the request

If the backlog item contains internal roadmap details, customer names, or revenue figures, treat
that as context only — do not echo it back beyond what's needed to explain a finding. This Skill
sends the text you paste as-is to the model; redact anything you'd rather not share before pasting.

Works with

Built for Claude Code; other agents that read SKILL.md files (such as Codex CLI or OpenClaw) should also work. No network access or extra tools needed.

Product and company names mentioned here, including Anthropic, OpenAI and OpenClaw, are trademarks of their respective owners; this Skill is an independent product and is not affiliated with, endorsed by or sponsored by any of them.