Inizia
Audits, normalizes, and levels multi-quote subcontractor bids for general contractors and estimators. Runs programmatic trade-variance calculations, detects hidden scope gaps, and generates dual-version bid leveling reports and supplier RFI drafts.
#Produttività#Analisi#Finanza
Valutazione
Servono altre valutazioni
Venduti
0
Come si usa
Esegui su Capafy
Anche su app esterne
Fornito dal publisher
GPT-5.6 Terra

🏗️ BidWise
An automated construction estimating and bid-leveling AI agent designed for General Contractors (GCs), project managers, and trade estimators to normalize competing trade quotes, calculate baseline variances, and expose hidden scope omissions.

🚀 Core Capabilities

  • Multi-Quote Normalization: Ingests unstandardized subcontractor quotes across electrical, HVAC, plumbing, and general trades to calculate true leveled costs.
  • Deterministic Math Validation: Runs an internal Python engine (validator.py) to compute mean trade costs, percentage price variances, and bid spread metrics without LLM math hallucination.
  • Trade Scope Gap Audit: Cross-references quotes against trade scope baselines (references/trade_scope_baselines.md) to detect missing line items (e.g., trenching, crane rental, permits, low-voltage).
  • Dual-Output Generation:
    1. Internal Bid Leveling Matrix: Comprehensive risk scorecard, scope gap allowances, and negotiation levers for internal estimating teams.
    2. Subcontractor-Facing RFI: Professional Request for Information (RFI) email draft to clarify unpriced or excluded line items with bidders.

⚙️ Architecture & Execution Flow
[Trade Quotes / Subcontractor Bids]
│ (JSON / Text Input)
▼
[Capafy AI Agent Workspace]
├── Runs Deterministic Math Engine (scripts/validator.py)
└── Cross-References Scope Baselines (references/trade_scope_baselines.md)
│
├──► Output 1: Internal Bid Leveling Matrix & Risk Scorecard
└──► Output 2: Subcontractor RFI / Clarification Email Draft

📋 Required Input Parameters
To execute a complete bid-leveling audit, provide:

  • project_title: Name or reference identifier of the project.
  • trade_category: Trade focus (e.g., Electrical, Mechanical/HVAC, Plumbing).
  • bids: Array of at least 2 subcontractor quotes including:
    • subcontractor: Company name
    • raw_price: Total quoted dollar amount
    • scope_inclusions: Stated work items
    • scope_exclusions: Explicitly excluded items

🛠️ Subscriber Setup Guide

  1. Subscribe: Secure your subscription for the Subcontractor Bid Leveler agent.
  2. Provide Trade Data: Paste competing subcontractor quotes directly into the chat prompt or pass JSON payloads via your Make.com/Zapier workflow bridge.
  3. Execute Leveling: Review the internal true-cost matrix and dispatch the generated RFI drafts to bidders.

Disclaimer: This agent generates bid-leveling analysis and draft summaries based solely on provided estimator data. Output does not constitute legal, structural engineering, or binding financial advice and should not be considered a substitute for consulting a qualified professional.