
Batch validate, clean, normalize, swap, and convert subtitle files with deterministic processing and failure-safe reports.

Turni di reparto pronti in Excel, con ore e coperture sotto controllo. Shift Planner Pro pianifica i turni del tuo reparto o negozio. Compili un modulo Excel con menu a tendina (contratti, ferie, permessi, coperture minime) e ricevi un file Excel pronto da stampare, con controllo automatico di monte ore, riposi e scoperture.

A daily AI planner that turns your routine — sleep, work, commute, meals, exercise — into a ranked, explainable "what to do next" list. Self-corrects when you report what you actually did. Nothing saved or reminded without your confirmation first.

Five demands, three people, one Friday deadline. Get a defensible schedule in one pass — who goes first on contested resources, the zero-float critical path, and the honest date when it doesn't fit.

This skill is based on practical Power Platform delivery patterns for safely creating, reviewing, and modifying Power Automate cloud-flow JSON in Dataverse solution exports. It focuses on issues that often break real client automations: runAfter paths, renamed action references, connection references, hardcoded values, TRY/CATCH logging, import safety, validation, and rollback notes.

Check SRT files in batches, get cue-level QA reports, and export conservative repair copies while preserving your originals. Includes explicit time shifts, overlap trimming and two-line track splitting. English edition. Python 3.10+; no API key needed for the local engine.

Fix SRT subtitle timing with precise offset, FPS conversion, and two-anchor drift correction. Deterministic, local, and fail-safe — no AI guessing.

A kickoff protocol (agent skill) for multi-step tasks. Before writing any code, the agent must: run a spec interview, batch every human-authorization step into one checklist, build a self-verification loop (log sink + verify script + dry-run) *before* the feature itself, and build comparable variants instead of blocking on third-party decisions.

Full meeting lifecycle: 3 agenda types, minutes with a worked example, an action-item tracker, sync + async standups, a hygiene checklist, and a guide to cutting meetings with cost math. Action items flow from agenda to minutes to tracker.