Factory Capacity & Layout Audit Pro

Factory Capacity & Layout Audit Pro

Turn factory data into a bottleneck, capacity, and layout-risk decision. #Comércio

Avaliação
São necessárias mais avaliações
Vendas
0
Como usar
Baixar

Factory Capacity & Layout Audit Pro

Turn factory, warehouse, assembly-line, or packing data into a clear expansion decision.

Provide station cycle times, staffing, daily demand, and optional material-flow data. Get a decision-ready audit that identifies the true bottleneck, required capacity, and layout risks before you add labor, equipment, or floor space.

中文样例:峰值日要出 1,200 箱,加人还是加装盒位?

以下为模拟数据。水果包装线每班有效作业 360 分钟,分拣、装盒、封箱分别用时 15、20、12 秒/箱。

方案 每班理论上限 与 1,200 箱目标相比
每道工序各一个工位 1,080 箱 缺 120 箱
装盒位增加一名帮手,节拍仍为 20 秒/箱 1,080 箱 缺 120 箱
两人各用一个独立装盒位,供料充足 1,440 箱 余 240 箱

原线的瓶颈在装盒。若单个装盒位能稳定达到 18 秒/箱,360 分钟恰好可装 1,200 箱。增加第二个独立装盒位后,瓶颈转到分拣。实际可承诺产量还要核对停机、返工和供料记录。

下载包内附三组 CSV,可用自己的工序节拍和需求量复算。

What you get

  • Peak-day and P90 demand analysis
  • Station-by-station capacity calculation
  • Bottleneck ranking by utilization
  • Required number of parallel stations
  • Daily capacity gap and expansion decision
  • Buffer-sizing checks
  • Material travel-distance analysis
  • Pedestrian / forklift aisle-crossing warnings
  • A concise management-ready Markdown report

Best for

  • Factory managers planning a new workstation
  • Warehouse and packing operations with missed delivery targets
  • Assembly lines with uncertain bottlenecks
  • Operations consultants preparing a capacity review
  • Teams deciding whether to add people, equipment, shifts, or floor space

How it works

  1. Provide three simple CSV files:

    • stations.csv — cycle time, parallel stations, operators, uptime, and queue target
    • demand.csv — daily production demand
    • flows.csv — optional distances, buffers, and aisle conflicts
  2. Run the included audit script.

  3. Receive:

    • ADD_CAPACITY, MANAGE_RISK, or CAPACITY_OK
    • the current bottleneck
    • the number of parallel stations required at peak demand
    • the next bottleneck to protect after expansion
    • layout actions ranked by severity

Example decision

Decision: ADD_CAPACITY

Packing is operating at 123% utilization on peak demand and requires 2 parallel stations instead of 1. Before adding the station, resolve the undersized buffer and the forklift/pedestrian aisle crossing between assembly and packing.

Included files

  • Reusable SKILL.md workflow
  • Python capacity and layout-risk audit tool
  • Ready-to-edit CSV templates
  • Input schema reference
  • Example data and automated test

Requirements

  • Python 3.8 or newer
  • No external Python packages
  • Runs locally and works offline
  • No API key or paid service required

Important note

This tool provides an operational screening audit. It does not replace detailed engineering, safety, fire-code, ergonomic, or regulatory review.