시작하기
Project Preflight — Diagnose & Set Up

Before you write code, kill the causes of rework. A phase-gate skill that runs a pre-implementation diagnosis (clarify requirements, success criteria, non-goals, hidden risks) and sets up the dev environment (toolchain check, repo init, dependency/secret/config templates, DB/API contract, folder layout). Each gate must pass before moving on. Delivers a diagnosis report, a stack-selection doc, and a ready-to-build foundation to hand off to implementation.

0판매
US$12
Stock Runway Lite|庫存天數試算

以現有庫存、預留量、確認到貨與自訂每日消耗試算庫存天數;不預測需求或自動下單。 Calculate inventory runway using on-hand stock, reservations, confirmed receipts and your chosen daily consumption; no demand forecasting or automatic ordering.

0판매
US$9.99
Factory Capacity & Layout Audit Pro

Turn factory data into a bottleneck, capacity, and layout-risk decision.

0판매
US$39
FactoryPilot Pro — Production Planning & Optimizer

Plan real factory orders across limited machines, material inventory and manufacturing steps. Detect late or blocked orders, compare what-if capacity scenarios, and export a reviewable production timetable, CSV reports and a calendar. No automatic ERP actions.

0판매
US$19.9 / 월
Floorplan to 3D Visual Brief

Turn a 2D floor plan, warehouse drawing or factory layout into a reviewable 3D concept visual prompt. Preserve stated spatial constraints, surface uncertainty, and compare the final image against the original plan.

0판매
US$19
Project Rescue

Diagnose software project risk, uncover the real blockers, and turn messy delivery problems into executable recovery plans.

0판매
무료 체험
Construction Schedule Builder

Build construction programmes with proper logic, realistic durations, and a real critical path.

0판매
US$9.99
ADA Remediation Playbook — Fix Every Defect

A scan tells you what is wrong. This tells you what to do. Same engine as the ADA Website Risk Scanner — 14 WCAG 2.2 AA check families. But instead of a defect list, you get a work plan: findings grouped into batches, ordered by exposure reduced per hour of developer time, each with before/after code, effort estimate, required skill, and a verification step. Three phases. Quick wins first. A project manager can assign it as-is.

0판매
무료 체험